Posted on 24/01/2013
Gaydon, Warwickshire

Gaydon, Warwickshire

Site of the new AML facility built on the site of a former RAF V-bomber base. Opened in September 2003 with manufacture of the DB9 starting in early 2004. A second production line for the V8 Vantage opened in 2005.